Guangzhou Rail Transit Line 13
Release Time:
2020-12-23 15:52
Source:
Construction Location: Zhucun Station ~ Yuzhu Station Interval
Project Profile: The interval line is mainly laid along Zhongshan Road, side through the factory, residential buildings, gas station, military area, Guangzhou operation business headquarters, under the Hinzibao Bridge, A219 high bridge, BRT Lianxi Station, BRT Maogang Station and its footbridge and other buildings (structures). The main strata crossed by the interval are strong~weakly weathered sandstone, conglomerate sandstone, and strong~weakly weathered muddy siltstone.
Equipment type: CSTE06680H soil-pressure balance liquid-driven shield machine, 2 sets, excavation diameter 6680mm, main drive power 945kW.
Previous Page
Next Page