Guangzhou Rail Transit Line 11
Release Time:
2020-12-23 15:53
Source:
Construction Site:Hedong East Station-Nanshi Road Station-Yangang Station Section
Project Overview:After the interval line out of Hedong East Station, along the Fangcun Avenue from north to south, with 350m left curve, through the Guangzhou Shipyard, across the Pearl River, through the Nanshi Second Street residential housing into the Nanshi Road Station, out of the Nanshi Road Station, through the kindergarten of the paper, dormitory buildings, to the east through the industrial avenue and the Guangzhou-Foshan line into the Yanguang Station. The main strata crossed are medium-weathering muddy siltstone, slightly weathered medium-coarse sandstone and gravelly sandstone.
Equipment type: 2 sets of CSTE06280H earth pressure balance (hydraulic main drive)machine with excavation diameter of 6280m and main drive power of 945kW.